The results of the implementation of the investment program in 2018
Information on the results achieved in 2018 due to the implementation of the measures included in the investment program following the order of the Ministry of Energy of Russia dated 14.03.2017, No. 177
Seq No.
Indicators
Results 2018
1
The degree of loading the transformer substations
56%
2
Changes in the share of net power supply generated by electricity metering devices included in the data collection and transmission system (metering automation level)
+16.99%
3
Change in the average duration of the termination of the transmission of electricity to consumers of services
–1.1138 h
4
Change in the average frequency of stopping the transmission of electricity to consumers of services
–0.5012 шт.
5
The total number of grid connection commitments for the implementation of technological connection, executed in the framework of the investment program
26,985 contracts, including the preferential category of applicants – 21,401 contracts
6
Maximum power of connected electricity consumers, power generation facilities, electric grid facilities owned by other network organizations or other persons
723 MW, including the preferential category of applicants – 249 MW